The development of the new Project 24 commenced in 1941. The projects requirements included dual-purpose artillery instead of secondary guns, enhanced torpedo protection, and reinforced protection of the ships fore and aft ends. The ships designation was to destroy surface ships of all types in the open sea and near coastal areas. In 1950, variant XII of the project was approved; however, the country lacked a shipyard to construct a 70,000-ton displacement ship. The state authorities had also lost interest in large surface ships by that time.